+ o - ^
previous next
Index

This transverse section of the Thames, with a longitudinal section of the Tunnel beneath it, shews [shows] the progress of the work to the extent of 600 feet from the shaft at Rotherhithe towards Wapping...

More Details Cite This Item

1158874
Purchase Options

Image ID 1158874 may be purchased in print and digital forms:

Download Options

View this item elsewhere:

Names
Thames Tunnel Company (Author)
Collection

explanation of the works of the tunnel under the Thames from Rotherhithe to Wapping.

Dates / Origin
Date Issued: 1836
Place Term: London
Publisher: W. Warrington, engraver and printer
Library locations
Rare Book Division
Shelf locator: VDCP (Thames Tunnel Company, London. Explanation of the works of the tunnel. 1836)
Topics
Tunnels -- England -- London
Thames Tunnel (London, England)
Genres
Engravings
Type of Resource
Still image
Identifiers
RLIN/OCLC : 8899815
NYPL catalog ID (B-number) : b13752528
UUID: 7a35fa80-c62a-012f-59ce-58d385a7bc34

Item timeline of events

  • 1836: Issued
  • 2013: Digitized
  • 2015: Found by you!
  • 2016

MLA Format

Rare Book Division, The New York Public Library. "This transverse section of the Thames, with a longitudinal section of the Tunnel beneath it, shews [shows] the progress of the work to the extent of 600 feet from the shaft at Rotherhithe towards Wapping..." The New York Public Library Digital Collections. 1836. http://digitalcollections.nypl.org/items/510d47dd-fd16-a3d9-e040-e00a18064a99

Chicago/Turabian Format

Rare Book Division, The New York Public Library. "This transverse section of the Thames, with a longitudinal section of the Tunnel beneath it, shews [shows] the progress of the work to the extent of 600 feet from the shaft at Rotherhithe towards Wapping..." New York Public Library Digital Collections. Accessed July 4, 2015. http://digitalcollections.nypl.org/items/510d47dd-fd16-a3d9-e040-e00a18064a99

APA Format

Rare Book Division, The New York Public Library. (1836). This transverse section of the Thames, with a longitudinal section of the Tunnel beneath it, shews [shows] the progress of the work to the extent of 600 feet from the shaft at Rotherhithe towards Wapping... Retrieved from http://digitalcollections.nypl.org/items/510d47dd-fd16-a3d9-e040-e00a18064a99

Wikipedia Citation

<ref name=NYPL>{{cite web | url=http://digitalcollections.nypl.org/items/510d47dd-fd16-a3d9-e040-e00a18064a99 | title= (still image) This transverse section of the Thames, with a longitudinal section of the Tunnel beneath it, shews [shows] the progress of the work to the extent of 600 feet from the shaft at Rotherhithe towards Wapping..., (1836) }} |author=Digital Collections, The New York Public Library |accessdate=July 4, 2015 |publisher=The New York Public Library, Astor, Lennox, and Tilden Foundation}}</ref>

This transverse section of the Thames, with a longitudinal section of the Tunnel beneath it, shews [shows] the progress of the work to the extent of 600 feet from the shaft at Rotherhithe towards Wapping...