+ o - ^
previous next

Contract No. 3. Concrete roadway, sidewalk and north wall with low tension ducts (Spring Street). North Tunnel, west of Washington Street, New York, 9/19/24, 2:50 p.m.

More Details Cite This Item

435322

View this item elsewhere:

Title
Contract No. 3. Concrete roadway, sidewalk and north wall with low tension ducts (Spring Street). North Tunnel, west of Washington Street, New York, 9/19/24, 2:50 p.m.
Names
New Jersey Interstate Bridge and Tunnel Commission (Compiler)
Collection

Photographs of the construction of the Holland Tunnel, 1919-1927

New Jersey Interstate Bridge & Tunnel Commission.

Dates / Origin
Date Created: 1924-09-19
Library locations
General Research Division
Shelf locator: VDF+ (New Jersey. Interstate Bridge and Tunnel Commission. Photographs of the construction of the Holland Tunnel)
Topics
Tunnels -- New York (State) -- New York
Holland Tunnel (New York, N.Y.)
Underwater tunnels -- Hudson River (N.Y. and N.J.)
Genres
Photographs
Notes
Ownership: Weller H. Noyes. Yale University Library.
Content: 5535
Type of Resource
Still image
Identifiers
RLIN/OCLC: 46986543
NYPL catalog ID (B-number): b15048916
Universal Unique Identifier (UUID): 496fecd0-c6c0-012f-bfd5-58d385a7bc34
Rights Statement
The copyright and related rights status of this item has been reviewed by The New York Public Library, but we were unable to make a conclusive determination as to the copyright status of the item. You are free to use this Item in any way that is permitted by the copyright and related rights legislation that applies to your use.

Item timeline of events

  • 1924: Created
  • 2013: Digitized
  • 2024: Found by you!
  • 2025

MLA Format

General Research Division, The New York Public Library. "Contract No. 3. Concrete roadway, sidewalk and north wall with low tension ducts (Spring Street). North Tunnel, west of Washington Street, New York, 9/19/24, 2:50 p.m." The New York Public Library Digital Collections. 1924. https://digitalcollections.nypl.org/items/510d47da-dcfd-a3d9-e040-e00a18064a99

Chicago/Turabian Format

General Research Division, The New York Public Library. "Contract No. 3. Concrete roadway, sidewalk and north wall with low tension ducts (Spring Street). North Tunnel, west of Washington Street, New York, 9/19/24, 2:50 p.m." New York Public Library Digital Collections. Accessed March 28, 2024. https://digitalcollections.nypl.org/items/510d47da-dcfd-a3d9-e040-e00a18064a99

APA Format

General Research Division, The New York Public Library. (1924). Contract No. 3. Concrete roadway, sidewalk and north wall with low tension ducts (Spring Street). North Tunnel, west of Washington Street, New York, 9/19/24, 2:50 p.m. Retrieved from https://digitalcollections.nypl.org/items/510d47da-dcfd-a3d9-e040-e00a18064a99

Wikipedia Citation

<ref name=NYPL>{{cite web | url=https://digitalcollections.nypl.org/items/510d47da-dcfd-a3d9-e040-e00a18064a99 | title= (still image) Contract No. 3. Concrete roadway, sidewalk and north wall with low tension ducts (Spring Street). North Tunnel, west of Washington Street, New York, 9/19/24, 2:50 p.m., (1924)|author=Digital Collections, The New York Public Library |accessdate=March 28, 2024 |publisher=The New York Public Library, Astor, Lenox, and Tilden Foundations}}</ref>

Contract No. 3. Concrete roadway, sidewalk and north wall with low tension ducts (Spring Street). North Tunnel, west  of Washington Street, New York, 9/19/24, 2:50 p.m.